Load prioritisation
Not every device must remain on at once — you define the priorities.
Solution · Private home
Heating controls, pumps, refrigeration and lighting are assessed individually. Whole-home backup requires checking the total load and wiring.

Not every device must remain on at once — you define the priorities.
Desired operating time is calculated from actual consumption and usage patterns.
Grid, generator or solar integration is considered only after the exact configuration is confirmed.
Placement
The location is selected against the equipment’s requirements, temperature, ventilation, humidity, cabling and service access.